Case studyThe Global Draw Hounslow

The Global Draw

Hounslow

Value: £200,000

Completed: September 2008

Project: Installation of Mezzanine Floor & Office Suite 5000 sq ft

The new mezzanine floor was installed over an existing stores facility to create additional office space within the warehouse environment.

The floor was installed without disruption to the warehouse operations, leaving the clients ‘day to day’ business activities uninterrupted.

The mezzanine floor was enclosed within a 1-hour fire rated Jumbo Stud perimeter wall to comply with Building regulations and the interior space was fitted out with new suspended ceilings, perimeter insulated wall lining, internal partitioning and decorative finishes.

Fully automated air conditioning was installed to serve the heating & cooling requirements in the suite and Kube carried out the complete electrical upgrade and installation, including lighting, power, data cabling and fire alarm system.

The project was completed on time in a total of 10 weeks and was on budget.